Skip to content
Wall of aluminium framed glazing in a Dubai apartment with the skyline behind the glass

Glazing units

The frame holds the opening; the glass decides how much heat, glare and noise reach the room. Nine types below, each matched to what its elevation has to stop.

Calculate cost

48h

Survey on site

3500+

projects completed

Choose a unit by what it has to stop

Modern villa with panoramic aluminium glazing and a pool at sunset

Let's calculate
the cost of glazing

Get a free calculation for your windows — just leave your number, we'll reply on WhatsApp within 15 minutes.

Advantages of working with us

  • In-house production

    Windows, doors and glazed structures are made at our own factory in the UAE. Manufacturing takes 3–5 weeks from the survey, and the dates are written into the contract.

  • Room measurement

    After a free consultation, an engineer comes to measure within 48 hours and answers the technical questions on site — openings, profile, glass and hardware.

  • Delivery of products

    We deliver with our own transport across Dubai and all Emirates, and the installation date is agreed in advance so the crew arrives with the finished units.

  • Installation on site

    A "clean" installation is carried out – all construction debris is removed, and dust and dirt are cleaned. Work can be conducted with or without your presence. The date and time are discussed individually.

  • Guarantee

    The structures we make and the installation our crews carry out are covered by one warranty under one contract. The profile system also carries the manufacturer's warranty — up to 20 years, depending on the system.

  • Service

    Warranty cases are handled by the same crews that did the installation: send the address and photos, and in most cases we can say before the visit whether it is an adjustment, a gasket or a glass unit.

What goes into specifying the glass

  • Survey of every elevation Engineer on site within 48 hours
  • Glass build set per facade West and north are not glazed alike
  • Unit assembly in our Dubai factory Lead time is stated in the quote
  • Edge seal and spacer specification Sized against heat, dust and humidity
  • Glazing into the frame on site Units set on packers in the rebate
  • Replacement of failed units Existing frames kept where they are sound

Pricing

Aluminium Windows and Doors Calculator

Choose the options — we’ll send the price on WhatsApp

What are we making

Shape and opening

Size

Width and height: 300–6000 mm. Not sure? Clear the fields — we’ll measure at the free survey.

Glazing unit

Extras

Do you need a windowsill?

Do you need a coloured profile?

Do you need installation?

Brands we work with

Frequently asked questions

Double, in almost every case. The second pane and the sealed cavity do the work here. A third pane is aimed at sub-zero winters: it adds weight, thickness and a heavier sash for very little where the problem is sunlight rather than frost. In this climate you change the coating on the glass instead of adding another pane.

No. Film is applied to the room side of glass you already own, where every cloth and squeegee reaches it; Dubai Municipality accepts films certified by Dubai Central Laboratory (DCL), so a good one is a fair retrofit. A solar-control coating is laid on the pane at the glass works: most today are sputtered soft coats, sealed inside the unit facing the cavity, and only pyrolytic hard coats are baked into the surface. Tint mainly darkens the view; the coating filters the heat and leaves the room bright.

It will cut it, not remove it. Sound takes the weakest path, so an acoustic unit only pays off when the frame and the seals are tight as well. We look at what is around the building first: a motorway, a construction site or a flight path. Road and aircraft noise are rated by the same figure, Rw + Ctr, which weights the low frequencies that are hardest to stop, so the pane combination is chosen for how loud the source is at your window. And we say plainly when the noise is arriving through the wall or the air-conditioning opening rather than the window.

You see it before you measure it: mist or droplets appear between the panes and no amount of cleaning removes them, because the edge seal has failed and humid outside air is now inside the cavity. That unit is replaced, not repaired. Because the units are assembled in our own Dubai factory, a replacement is remade to the same sizes from the drawing on file. The warranty terms for the specified glass and spacer are written into the quote.

We are always happy to welcome you at our showroom

Main Office

Dubai — Showroom

The Pinnacle Building, Sheikh Zayed Road, Office 607

Mon–Fri: 9:00 – 18:00

+971 50 220 6913

Showroom

Samples to see in person

Profiles, glass units and hardware to see and touch before you choose.

Dubai — Showroom The Pinnacle Building, Sheikh Zayed Road, Office 607
Get directions