Skip to content
Wrapped aluminium window units on a padded trolley beside a delivery truck at a Dubai villa
  • OWN CREWS
  • CLEAN HANDOVER

Delivery and fitting

A window can be made perfectly and still fail on the day it is fitted — the risky part of the job is the journey from the bench to the opening. Units leave our Dubai workshop wrapped and edge-protected, travel upright on padded stands, and are carried up by the same crew that will fit them rather than left in a lobby for somebody else to move. That crew removes the old frames, sets and levels the new ones, seals the perimeter inside and out, adjusts every sash and takes the debris away with them.

  • from Dubai factory to site
  • seven emirates installation coverage
  • in-house fitting crews
Book a free survey

From the bench to the opening

  • Wrapped

    Packing

    Film on the frames, guards on the glass edges

  • Upright

    Transport

    Padded stands, secured for the road

  • Carried up

    Lifting

    Stairs, service lift or hoist agreed at survey

  • Set and sealed

    Fitting

    Levelled, fixed and sealed on all sides

  • Cleared

    Finishing

    Old frames and packaging taken away

How we work

  1. Measurement

    Free survey: an engineer on site within 48 hours.

  2. Project

    Configuration, colour and price are agreed after the survey.

  3. Production

    3–5 weeks at our own factory in Dubai.

  4. Installation

    Installation and handover. Our warranty is set in the contract; the profile manufacturer’s runs up to 20 years.

How an installation day runs

  • Access checked before the truck moves Lift size, parking and permits sorted at survey
  • Floors and furniture protected Covers down before the first frame comes out
  • Old units removed opening by opening The home is never fully open to the weather
  • New frames set, levelled and fixed Squared to the drawing, not to the old frame
  • Perimeter sealed and finished Insulation and sealant inside and outside
  • Every sash adjusted at handover Opened, closed and checked with you present

Let's calculate
the cost of glazing

Get a free calculation for your windows — just leave your number, we'll reply on WhatsApp within 15 minutes.

Branded Aluminum Windows UAE service car on a Dubai seafront road

Frequently asked questions

No. Openings are done one at a time so the home is never fully open, and floors and furniture are covered before the first frame comes out. In an occupied flat we plan the sequence around the rooms you need — bedrooms first, or the majlis last, whichever keeps the house usable.

That is decided at the survey rather than on the day. Where a unit fits the service lift it goes up the lift; where it does not, the crew uses stair-carrying frames or, for a wide pane high up a tower, a hoist or a rope access team arranged in advance with the building management.

We prepare what the building asks for — work permits, crew passes, agreed timings and any other documents the management requests — and submit them before the delivery is booked. Most towers restrict working hours and lift use, and the schedule is built around those rules rather than against them.

Nothing but the windows. Old frames, packaging, offcuts and sealant waste leave with the crew, and the glass and frames are cleaned before handover. Anything spotted during the walk-round is written down and closed before the job is signed off.

We are always happy to welcome you at our showroom

Main Office

Dubai — Showroom

The Pinnacle Building, Sheikh Zayed Road, Office 607

Mon–Fri: 9:00 – 18:00

+971 50 220 6913

Showroom

Samples to see in person

Profiles, glass units and hardware to see and touch before you choose.

Dubai — Showroom The Pinnacle Building, Sheikh Zayed Road, Office 607
Get directions