Hotels and restaurants
A hotel cannot empty itself for a window contract, so the job is cut into phases — a wing, a floor, a stack of rooms at a time — with the corridor sealed off and the rest of the building let as usual. In the rooms the brief is almost always sound: a bedroom facing a main road or a pool bar needs a laminated unit and a frame that seals the whole way round, because a good pane in a leaky frame changes nothing. Restaurants ask the opposite question — the largest possible pane with the fewest mullions, and a terrace that glazes up for the cooler season. Both go in around service hours.
- wing by wing how it is phased
- laminated units guest rooms
- seasonal enclosure restaurant terraces
What hospitality work asks for
-
Laminated unit
Guest rooms
Road and pool-bar elevations
-
Continuous seal
Frame perimeter
Where the noise actually leaks in
-
Fewest mullions
Restaurant glazing
Large panes, slim sightlines
-
Opens and closes
Terrace
Open in the cooler months, closed against the summer heat
-
By floor or wing
Phasing
Rooms stay sellable throughout
Let's calculate
the cost of glazing
Get a free calculation for your windows — just leave your number, we'll reply on WhatsApp within 15 minutes.
Why choose aluminium windows?
-
Durable EPDM seals
Three contours of EPDM seals keep the glass off the aluminium and close the gap between sash and frame, so dust, humid salt air and wind-driven rain stay outside.
Learn more -
Foamed thermal inserts
Foamed inserts fill the profile chambers and stop air circulating inside them, so less outside heat and street noise passes through the frame into the cooled room.
Learn more -
Polyamide thermal breaks
Glass-filled polyamide thermal breaks up to 40 mm wide keep the outer and inner shells apart, so the frame holds its shape and its insulation through a UAE summer.
Learn more -
Energy-efficient double glazing
Double glazing up to 60 mm thick puts a sealed gap of still air or gas between the hot street and the cooled room, so less heat crosses the glass into the room.
Learn more
How a hotel or restaurant job is staged
- Survey with the operations team Engineer on site within 48 hours
- Phases agreed against occupancy A wing, a floor or a stack of rooms
- Glazing set elevation by elevation Road side and courtyard are not the same
- Guest routes kept clear Corridor hoarded, service lift only
- Manufacturing in our Dubai factory Three to five weeks from the signed drawing
- Rooms handed back cleaned Back on sale once the crew is out
Brands we work with
Articles
Frequently asked questions
Related pages
Nearby pages and the rest of the catalogue.
Sections
Company
We are always happy to welcome you at our showroom
Dubai — Showroom
The Pinnacle Building, Sheikh Zayed Road, Office 607
Mon–Fri: 9:00 – 18:00
Samples to see in person
Profiles, glass units and hardware to see and touch before you choose.