Dubai — Showroom
The Pinnacle Building, Sheikh Zayed Road, Office 607
Mon–Fri: 9:00 – 18:00
A villa here stands with water on more than one side, and that takes away the back of the house. On an ordinary plot the good glass faces the garden and the modest glass faces a fence; on an island every elevation is looked at — from the walk around the lake and from the villas across the water — so there is no plain side to leave alone. The practical consequence is light: glare comes off the water as well as out of the sky, and it arrives at different hours on opposite elevations. The plot edge is the water itself, so where a lorry stops, where glass is set down and where the crew stands are decided at the survey rather than on the day.
All of them
Elevations on show
Seen from the lake walk and across it
Sky and water
Two sources of glare
Different hours on each side
Behind the glass
Privacy
Neighbours face you across the water
Set back from the bank
Lifting
Nothing heavy stands on the edge
Humid air
Condensation
Thermal break holds the inner face warmer
Get a free calculation for your windows — just leave your number, we'll reply on WhatsApp within 15 minutes.
Windows, doors and glazed structures are made at our own factory in the UAE. Manufacturing takes 3–5 weeks from the survey, and the dates are written into the contract.
After a free consultation, an engineer comes to measure within 48 hours and answers the technical questions on site — openings, profile, glass and hardware.
We deliver with our own transport across Dubai and all Emirates, and the installation date is agreed in advance so the crew arrives with the finished units.
A "clean" installation is carried out – all construction debris is removed, and dust and dirt are cleaned. Work can be conducted with or without your presence. The date and time are discussed individually.
The structures we make and the installation our crews carry out are covered by one warranty under one contract. The profile system also carries the manufacturer's warranty — up to 20 years, depending on the system.
Warranty cases are handled by the same crews that did the installation: send the address and photos, and in most cases we can say before the visit whether it is an adjustment, a gasket or a glass unit.
Office partitions made of aluminium profiles are a simple, quick, and cost-effective way to organise efficient zoning within a large space, while maintaining interior unity.
Made to size in our own factory in Dubai — in 3–5 weeks.
Nearby pages and the rest of the catalogue.
Sections
Company
The Pinnacle Building, Sheikh Zayed Road, Office 607
Mon–Fri: 9:00 – 18:00
Profiles, glass units and hardware to see and touch before you choose.
Free measurement
Leave your number — we call back to agree a time that suits you.
We reply within 15 minutes during working hours.