Skip to content
Aluminium-glazed Dubai Marina towers rising behind a low-rise villa community

Windows in Dubai

Dubai puts a marina tower and a walled villa plot into the same working day. Above the tenth floor the first question is how the crew reaches the outside of the frame; behind a community gate it is what the developer's design code allows on the elevation. Our factory sits in the same emirate, so a profile that has to be remade goes back on site without an import wait. Everything after that — survey, drawing, approval file — runs the same way in both.

Get a quote

48h

Survey on site

3500+

projects completed

Districts we work in

Let's calculate
the cost of glazing

Get a free calculation for your windows — just leave your number, we'll reply on WhatsApp within 15 minutes.

Branded Aluminum Windows UAE service car on a Dubai seafront road

Advantages of working with us

  • In-house production

    Windows, doors and glazed structures are made at our own factory in the UAE. Manufacturing takes 3–5 weeks from the survey, and the dates are written into the contract.

  • Room measurement

    After a free consultation, an engineer comes to measure within 48 hours and answers the technical questions on site — openings, profile, glass and hardware.

  • Delivery of products

    We deliver with our own transport across Dubai and all Emirates, and the installation date is agreed in advance so the crew arrives with the finished units.

  • Installation on site

    A "clean" installation is carried out – all construction debris is removed, and dust and dirt are cleaned. Work can be conducted with or without your presence. The date and time are discussed individually.

  • Guarantee

    The structures we make and the installation our crews carry out are covered by one warranty under one contract. The profile system also carries the manufacturer's warranty — up to 20 years, depending on the system.

  • Service

    Warranty cases are handled by the same crews that did the installation: send the address and photos, and in most cases we can say before the visit whether it is an adjustment, a gasket or a glass unit.

How a Dubai project runs

  • Survey booked around building hours Engineer on site within 48 hours
  • Drawing and wind-load calculation Taken at the actual height of the opening
  • NOC and method statement filed With the association or the developer
  • Service lift and loading bay booked Delivery window agreed in advance
  • Manufacturing in our Dubai factory Three to five weeks from the signed drawing
  • Installation, sealing and clean handover Floors protected, debris taken out daily

Brands we work with

Articles

Frequently asked questions

The owners' association or the building management, and their list is fairly consistent: a no-objection certificate, a method statement with a risk assessment, our trade licence, the names of the crew going upstairs, and the hours during which noisy work is allowed. Villa communities ask for something different — the design code usually fixes the external colour and the sightlines, so the elevation still reads as one street. We put that file together while the drawing is being finalised.

In a tower, most of it can. Inward-opening and tilt-and-turn sashes are specified here so often precisely because the frame, the seals and the glass unit can all be reached from inside the room. Where the detail genuinely needs someone on the outside — an external bead, a capping, a sealant line — our own rope access team does it rather than a hired cradle.

It changes what happens when something has to be redone. A profile cut to a corrected size, a replacement glass unit after site damage, an extra sash found during the survey — all of that is made in the same city and driven over, instead of joining the next import container. It also means the finish and the hardware can be seen in the flesh before the drawing is signed.

Yes, and most of our tower work is exactly that. The flat is done opening by opening: one window comes out, the new one goes in and is sealed, and the room is cleaned before the crew leaves. Furniture is sheeted, the route from the lift is protected, and the air conditioning stays running because the envelope is closed again before the crew goes.

We are always happy to welcome you at our showroom

Main Office

Dubai — Showroom

The Pinnacle Building, Sheikh Zayed Road, Office 607

Mon–Fri: 9:00 – 18:00

+971 50 220 6913

Showroom

Samples to see in person

Profiles, glass units and hardware to see and touch before you choose.

Dubai — Showroom The Pinnacle Building, Sheikh Zayed Road, Office 607
Get directions