From survey to installed window

Most people order windows without knowing what they will be asked to do next week. Here is the whole sequence, stage by stage, with the points where nothing moves until you say yes — and the three things that genuinely shift a date.

Published · updated · 6 min read

  • 48 hours to the survey
  • one drawing you have to approve
  • six stages from call to handover
Book a free survey

Why choose aluminium windows?

  • Aluminium window profile cross-section with three EPDM seal contours highlighted in red

    Durable EPDM seals

    Three contours of EPDM seals keep the glass off the aluminium and close the gap between sash and frame, so dust, humid salt air and wind-driven rain stay outside.

    Learn more
  • Aluminium window profile cross-section with a foamed thermal insert highlighted

    Foamed thermal inserts

    Foamed inserts fill the profile chambers and stop air circulating inside them, so less outside heat and street noise passes through the frame into the cooled room.

    Learn more
  • Aluminium window profile cross-section with polyamide thermal breaks highlighted

    Polyamide thermal breaks

    Glass-filled polyamide thermal breaks up to 40 mm wide keep the outer and inner shells apart, so the frame holds its shape and its insulation through a UAE summer.

    Learn more
  • Aluminium window profile with an energy-efficient double glazing unit highlighted

    Energy-efficient double glazing

    Double glazing up to 60 mm thick puts a sealed gap of still air or gas between the hot street and the cooled room, so less heat crosses the glass into the room.

    Learn more

A window order is mostly waiting, interrupted by four or five moments when it needs you. Knowing which moments those are is the difference between a job that lands on its dates and one that quietly slips because a drawing sat unopened for a week.

The survey, and what the engineer is checking

The survey is a structural check rather than a tape-measure formality, and it happens on site, usually within 48 hours of the enquiry. Every opening is measured at several heights and widths, because a wall that looks square almost never is, and a frame made to a single dimension will not drop into an opening that narrows towards the top.

Alongside the sizes the engineer records what the window will have to survive. Which way the elevation faces and what shades it at midday decide the glass. Height above the street decides the wind figure in the calculation. Distance from the sea decides the finish and the hardware. And what the old frame is fixed into — blockwork, concrete or a lightweight partition — decides the fixings, while a damp or crumbling reveal has to be made good before anything new goes into it.

Your part is access and answers. Someone has to open every room being glazed, and the questions asked on the day shape the specification: is this room slept in, does the majlis need privacy from the street, does night ventilation matter more than an uninterrupted pane. Answering them at the survey costs nothing. Changing the answer after the drawing is approved costs time.

The drawing, and the signature that starts the clock

Everything measured on site becomes a shop drawing: each opening as an elevation, with the sash divisions, the way every leaf opens, the glass build for that facade, the finish, the handle and the fixing detail. Once you approve it, that drawing is what will be made — and the three to five weeks of production are counted from your approval, not from the enquiry and not from the deposit.

Read it as a layout, not as paperwork. Two things repay a careful look. First, the direction each sash opens: a leaf that swings into a bed, a wardrobe door or a curtain track is the most common regret, and it is free to change here. Second, where the fixed panes and mullions fall, because a bar through the middle of the view is much harder to live with once it exists in aluminium. Colour is worth confirming against a sprayed sample seen outdoors rather than on a screen.

While you read, the structural calculation is run for your heights and panel sizes, and the building's paperwork is prepared where a tower demands it. That part rarely needs more from you than a signature and an introduction to the management office, but none of it can be skipped: a crew without approved documents does not get past the lobby.

In the workshop

Profile bars are cut to the approved sizes, machined for the hardware, and the corners assembled; the sealed glass units are made to match and glazed into the frames before they leave the bench. Because those benches are in Dubai, a standard size does not sit on a vessel for weeks and a mistaken dimension is remade here rather than reordered from Europe.

This is the long quiet stretch, and nothing is asked of you during it. It is also the stage where changing your mind costs the most: once aluminium has been cut to your drawing it is material, not a line on a spreadsheet, so a moved mullion means a new part rather than a correction.

Aluminium window fabrication bench in a Dubai workshop with cut profile bars in a rack and an assembled dark anodised frame lying flat
Cutting, machining, corner assembly and glazing all happen before the frame leaves the workshop.

Delivery, and the way in

Frames and glass arrive wrapped and on a booked slot, and the route from the lorry to the opening was decided long before that, usually at the survey. In a tower the service lift car is measured as carefully as the window itself: a panel that will not fit it is either split into more sashes while the drawing can still change, or lifted to a balcony. On a villa plot the constraints are the gate width, the paving and whatever is planted along the way.

Two things are asked of you here, and both are mundane. A clear route — cars off the drive, a corridor free of furniture, a lift key if one is needed. And somewhere for the packaging to go, because glass and aluminium arrive inside a great deal of foam and film, and that should leave with the crew rather than stay behind in a hallway.

Installation day, and what handover means

One opening at a time. The old frame comes out, the reveal is cleaned back and made good, the new frame is set on packers, levelled and plumbed in both directions, fixed into the structure, then insulated and sealed around the perimeter before the sashes are hung and the glass goes in. No opening is left open overnight.

Sealing is where an installation here is won or lost. Driven rain arrives sideways behind the wind and finds whatever the sealant missed, and blown sand collects in any drainage channel that was not left clear, so the perimeter joint matters more to your comfort than anything printed in a system brochure. Handover is a walk round with the crew: every sash opened and closed, locking checked, drainage tested with water, protective film off and the glass cleaned.

Sign a snagging list rather than a blanket acceptance. Anything you notice on the day — a stiff handle, a scuffed sill, sealant that was not tooled neatly — belongs on that list while the crew and their materials are still in the building rather than in a message a fortnight later.

New aluminium window frame set into a masonry opening on packers, protective film still on the profile, sealant gun and spirit level on a dust sheet
Levelled, packed, fixed, then sealed — the perimeter joint decides how the window behaves in driven rain.

The visit after, once the building has moved

New windows are set twice: once at handover and once after they have lived through a change of season. Buildings settle, aluminium grows through a hot afternoon and shrinks again overnight, gaskets take a set and hardware beds in — so a sash that closed sweetly in spring can want a turn on a hinge by the autumn.

That second visit is short. Hinges and rollers are adjusted, the closing pressure on the gaskets is reset, the drainage channels are cleared of the dust that always finds them, and the moving parts are lubricated. It is worth asking for rather than waiting until a sash starts to drag, and on a whole property it is usually folded into a maintenance agreement instead of being booked job by job.

Three things move dates, and all three are visible before you commit. A non-standard shape — an arch, a rake, a corner unit — adds drawing and cutting time before production even starts. An imported profile system adds a shipping leg that a Dubai-made one does not have. And access decides how much can happen in a day: an association's approval, a booked lift, a plot a lorry cannot reach. Ask at the survey which of the three applies to your job, and the dates in the quote will be the dates you get.

Profile Systems

  • Schuco aluminium profile system cross-section

    Schuco

    Schüco aluminium systems carry large panes on slim frames — for villas, apartments and offices where the view matters.

    Learn more about Schuco
  • GUTMANN aluminium profile system cross-section

    GUTMANN

    GUTMANN systems are offered by Gutmann Middle East LLC, based in Dubai Investments Park: hinged windows and doors, sliding and lift-and-slide doors, curtain walls and glass railings

    Learn more about GUTMANN
  • Deceuninck uPVC profile system cross-section

    Deceuninck

    Deceuninck uPVC profiles are designed in Belgium for superior insulation, weather resistance and a sleek finish. A popular choice for energy-efficient homes across Europe

    Learn more about Deceuninck
  • Cortizo aluminium profile system cross-section

    Cortizo

    Cortizo aluminium systems combine precise Spanish engineering with high thermal and acoustic performance. A reliable choice for windows, doors and facades that need to perform in demanding climates

    Learn more about Cortizo
  • Gulfex Montana 120 aluminium profile system cross-section

    Montana 120

    Montana 120 is a thermal-break sliding series from Gulfex (Gulf Extrusion LLC), with the profile extruded here in Dubai. A straightforward choice for sliding windows and balcony doors of ordinary size

    Learn more about Montana 120
  • Gulfex TB-600 aluminium profile system cross-section

    TB-600

    TB-600 is the thermal-break hinged window and door series of Gulfex (Gulf Extrusion LLC). The profile is extruded in Dubai, and the same maker covers sliding, folding and curtain-wall systems

    Learn more about TB-600
  • ALUK aluminium profile system cross-section

    ALUK

    ALUK is an Italian aluminium systems brand known for slim, minimalist frames that maximise glass area without compromising strength. Perfect for architectural projects that call for a light, contemporary look

    Learn more about ALUK
  • Vetromax glazing system profile

    Vetromax

    Vetromax combines advanced glazing technology with aluminium framing for maximum light, strength and energy efficiency. A modern solution for panoramic windows and glass facades

    Learn more about Vetromax
  • REHAU uPVC profile system cross-section

    REHAU

    REHAU uPVC systems are engineered in Germany for outstanding thermal insulation, soundproofing and long-term durability. A proven choice for energy-efficient windows and doors worldwide

    Learn more about REHAU
Modern villa with panoramic aluminium glazing and a pool at sunset

Let's calculate
the cost of glazing

Get a free calculation for your windows — just leave your number, we'll reply on WhatsApp within 15 minutes.

Popular ready-made solutions

Frequently asked questions

At your approval of the drawing. Not at the enquiry, not at the deposit. Anything still open on that drawing is holding production — a colour being chosen, a sash direction still argued over — which is why we would rather push back for two days at the drawing stage than start making something that has to be made again.

For the survey and for handover, yes, or somebody who can make decisions in your place. In between you do not, and plenty of owners simply leave a key. What we do ask for is a named contact reachable during the working day, because the small questions that come up mid-installation — which way a handle should face, whether a sill can be trimmed — are far quicker to answer than to guess.

Before cutting starts, usually yes, and you will be told what it does to the date before you decide. After the profile has been cut to your sizes a change means new material rather than an adjustment. That is precisely why the drawing stage is deliberately unhurried: it is the last inexpensive moment in the whole job.

It usually surfaces at the survey rather than on the day, which is the point of surveying properly. A wet or crumbling reveal is made good before the new frame goes in, because otherwise the fixings have nothing to hold and the sealant has nothing to bond to. If it is serious enough to change the price, you hear that before the profile is ordered — not while a frame is standing in your living room.

We are always happy to welcome you at our showroom

Main Office

Dubai — Showroom

The Pinnacle Building, Sheikh Zayed Road, Office 607

Mon–Fri: 9:00 – 18:00

+971 50 220 6913

Showroom

Samples to see in person

Profiles, glass units and hardware to see and touch before you choose.

Dubai — Showroom The Pinnacle Building, Sheikh Zayed Road, Office 607
Get directions